Molitaris Consulting

Post-Call Sync, August 4

Incorrect password
Press Enter to continue
Ambrosia · August 4 weekly sync

July closed with cost per qualified lead cut by more than half, and Google now bids directly on VOB on Queue

Google Ads and Salesforce reviewed on today's call · paid counts are Google-attributed (click-matched in Salesforce) · every change below is already live
−54%
cost per qualified lead, July vs June
$2,576 → $1,191
71
qualified Google-attributed leads in July
29 in June
+62%
leads reaching VOB on Queue
26 → 42
$84.6K
July spend
the pull-back landed the agreed $85K

July against June, on the click-by-click numbers

Every figure below is Google-attributed: a lead whose ad click is captured in Salesforce, so nothing here depends on estimates or platform modeling. Spend rose 13% month over month. Qualified leads rose 145%, and the leads reaching VOB on Queue rose 62%. That is the shape we want: cost up a little, VOB on Queue pipeline up a lot.

MetricJuneJulyChange
Spend$74,698$84,569+13%
Qualified Google-attributed leads2971+145%
Cost per qualified lead$2,576$1,191−54%
Leads reaching VOB on Queue2642+62%
Cost per VOB on Queue lead$2,873$2,013−30%

Qualified = the lead converts to an opportunity in your Salesforce. VOB on Queue = your team begins the insurance benefits check, the stage that predicts admission at 3x the rate of leads that never reach it.

Two more things July had going against it, and it still won. Your team's own tracking confirms July outperformed July 2025 on both ads and SEO. And July did it while a CTM security change was silently blocking form submissions for part of the month: we found it, added the token fix, and replayed the missed leads to your team through CTM. August runs with forms fully flowing.

The second half of July is where the optimization shows

The bidding changes went in mid-July. Splitting the month at the 14th shows what they did: VOB on Queue entries went from 1.0 to 1.6 per day, and the cost of each one fell 27%.

WindowSpend/dayVOB on Queue entriesPer dayCost per VOB on Queue lead
July 1-14 (before the bidding change)$2,464141.0$2,464
July 15-31$2,946281.6$1,788
VOB ON QUEUE ENTRIES / DAY Jul 1-14 Jul 15-31 1.0 1.6 COST PER VOB ON QUEUE LEAD Jul 1-14 Jul 15-31 $2,464 $1,788

Admissions followed the same curve

July finished with 12 Google-attributed admits, and 7 of them landed after the 15th. Every fresh-lead admit in the second half came from an ad click dated after the bidding change, with 0 to 7 days from click to admission. The same acceleration we flagged on the July 28 call carried through the end of the month, including one more that arrived after that call.

PatientAd clickAdmittedClick to admit
Micah S.July 15July 227 days
Terrence H.July 20July 233 days
Ashonda W.July 26July 26same day
Kristi B.July 27July 27same day
Scott W.July 29July 312 days

And July is not done producing: 60 of July's Google-attributed leads are still active in your pipeline, and five of them have already moved into the stages that sit right before admission.

LeadArrivedCurrent stage
William G.July 29VOB In Progress
Jasmina G.July 23Priority Follow Ups
Stephen F.July 25Priority Follow Ups
Bobby W.July 28Priority Follow Ups
Emmanuel J.July 31Needs Travel/Detox

Click-to-admit historically runs 1 to 3 weeks, so July's admit count keeps growing through August, the same way 3 admits on July 21 became 12 by month close. Per today's call, Emmanuel is out for pre-authorization and Jasmina is being actively worked through her medical review.

The graduation is live: General Rehab now bids on VOB on Queue

The VOB on Queue signal we turned on in observation mode on July 28 collected volume for a week, and July confirmed the density: 42 Google-attributed leads reached VOB on Queue, well above what bidding needs to learn. So this morning we made the switch we have been building toward since June.

Live as of this morning: the General Rehab campaign now optimizes to leads that reach VOB on Queue, instead of every lead that reaches Missing Info, the entry stage one step earlier in your funnel that the bidding learned from until now. Google will spend the next week or two re-learning against the stronger signal, which is normal, and we will judge the results at the end of August rather than day by day.

We are rolling this out one campaign at a time, on purpose. General Rehab goes first because it has the deepest data. Mental Health stays on the qualified-lead signal that just produced its admit cluster and follows in the next week or so, per today's call. Teen is still building its baseline and is not ready for this step yet.

Decided on today's call: the August plan

DecisionThe plan
August budgetHold at $85K, the same discipline that landed July at $84.6K. Ramp conversation on next week's call, with General Rehab first in line for any increase.
The goal: 20 admits20 Google-attributed admits a month is the target. The most direct path is weighting spend toward General Rehab, your best producer, and we will balance that against the Mental Health and Teen mix as the ramp decisions come.
Marijuana research studyNew, separate campaign at $5K for one month, on top of the $85K and outside the management fee. Localized to your county and the neighboring counties, using only the approved research ad copy, with its own landing page and search terms aimed at people struggling with marijuana use rather than study-seekers. Landing page goes to Doc for approval, live by Friday. Leads flow through your existing CTM and Salesforce funnel with campaign attribution intact, so no separate phone number is needed, and Connor's screening keeps routing clean.
Teen timingHold the bigger push about two weeks until kids are back in school, when demand picks up. The head start still pays off: the campaign's negatives and baseline are already built, so the ramp lands on a tuned campaign.

August so far: three days in, the trend is holding

Small sample, three days, and on reduced spend while budgets ramp back up. But the early shape matches where July was heading:

$990
cost per qualified Google-attributed lead, Aug 1-3
$1,191 in July, $2,576 in June
4 of 5
new leads already reached VOB on Queue
within days of arriving
$1,237
cost per VOB on Queue lead, Aug 1-3
$2,013 in July

Two of those leads are sitting in VOB on Queue as of this morning, which makes them among the first through VOB on Queue under the new setup: from here, every one of them teaches General Rehab's bidding who to go find next.